Wednesday, March 19, 2008

New Basement, Dishwasher & Backyard

The three most important things for us - a basement, backyard and most important a dishwasher!

This as you can see is the basement, it's 3/4s painted with a tan (Pyramid is the name) epoxy garage floor paint. Very nice, much better than the yucky floor that was there before.

Our new washbasin, which I very much like as it means I don't have to clean paints or other stuff in the kitchen sink - which means Becky really likes it too.

All the crap that we had to move to paint the floor - some of it is garbage, but alot of it will be moved back after 72 hours of curing time.

Painting the inside of the kitchen drawers with Killz - much needed, it may actually need two coats of Killz to cover all the grease and crap. Man is that stuff thick, it's got to be as bad as painting in Mexico in 30 degree weather.

More Pics to come as apparently Picasa only uploads 4 at a time :-(

No comments: